Multi-site
Central kitchen, multiple outlets: how to organise dispatch
The hard part of a central kitchen is not producing: it is knowing who asked for what, and what actually arrived.
Klyra Editorial · Published on 21 August 2026 · 7 min read
When production is centralised the bottleneck moves from the kitchen to communication: orders collected in chats, quantities changed verbally, shipments with no receipt confirmation. The outcome is always the same — stock that does not add up and arguments about shortages.
Four steps to keep separate
- Internal order: what each outlet requests, and by when.
- Production run: what is actually produced, with quantities and an owner.
- Shipment: what leaves, to whom and when.
- Receipt: what arrived, with discrepancies logged by whoever receives it.
Recurring orders and templates
Most internal orders repeat. Templates per outlet and weekday cut errors and save time: you adjust a quantity instead of rewriting the list.
Thresholds that prevent emergencies
- Minimum threshold per item and per outlet, not one global value.
- Critical-stock alerts on semi-finished items, not only finished products.
- A history of shortages, to see which thresholds are genuinely mis-set.
What to measure weekly
Delivery punctuality, shipped-versus-received differences and batch yield. Three numbers: if they degrade together, the problem is production planning, not the individual outlets.
FAQ
Does the central kitchen need its own stock location?
Yes: keeping kitchen stock separate from outlet stock is the only way to read real consumption and yield.
Keep reading
Keep reading
Produzione e dispatch multi sede
Practical guides on HACCP, food cost, rotas and multi-site management.
Start free